Skip to content

Where your servers run.

One contract, one team, our own network. Today our racks are at Greenergy's Tallinn DC-1, on the western edge of Tallinn.

Aerial view of Greenergy's Tallinn DC-1 at golden hour, with the Harku substation behind it
Site today
Tallinn DC-1
Rack power, standard hall
Up to 21 kW
Cooling
Air
On site, Greenergy
24/7
Jurisdiction
Estonia, EU

The building

Opened
2022, next to Elering's Harku 330 kV substation.
Size
Three storeys, about 14 500 m².
Owner
Greenergy's first building. Greenergy owns and operates it.
Our space
We rent space and power in its standard hall.

EN 50600, and what it covers

Certificate
EN 50600 for Greenergy's Tallinn DC-1, by TÜV NORD, Availability Class 3.
Status
We share the certificate on request.
What it covers
The building's design and operation, not 3NV's information security.

Power and cooling

As Greenergy reports.

Feeds
Two utility feeds, with separate A and B power paths.
UPS
Each power path has its own UPS room.
Generators
Diesel generators on site.
Racks
Up to 21 kW per rack in the standard hall, on 32 A PDUs, air-cooled.
Tailored
Tailored deployments take higher densities, other PDU setups and liquid cooling, by assessment with Greenergy.
Renewable
Greenergy states its electricity supply is 100% renewable; its documentation is available on request.

Getting into the hall

Run by Greenergy.

Access
Layered access control with biometric checks. Your team gets in under a three-party access agreement between you, us and Greenergy.
On site
CCTV and staff on site around the clock.
Fire
Fire prevention uses oxygen reduction.
Procedures
We share the detailed procedures under NDA.

Our own network

Network
Our network is AS214132, registered to 3NV with RIPE NCC.
Your connection
Your node will connect to our edge, with IP transit and peering at the Tallinn internet exchange.
Cross-connects
To other carriers in the building, on request.
Latency
We'll publish figures once we've measured them on this network, with the date and method.

Who works on the hardware

Greenergy
Its on-site team does hands-on work at any hour, at our request.
3NV
We handle the hardware itself: diagnosis, spares and replacement.

See it before you sign.

We arrange escorted visits to Tallinn DC-1 with Greenergy for teams planning a deployment. Bring photo ID; we register you in advance.